|
Re: Construction Help
doa slope of 2in per foot over the 14 foot part sloping down like a normal roof then pull rubberroofing (buy scraps way cheaper)
pull it over and leave a foot on the side
roll each side around a 2x2 and deck screw to building
then just leafblow off from topside each year
__________________
88 F-250 body,550 rear frame setup, 7.3 idi, back up camera, class 5 bumper hitch welded to frame and gusseted, front mount hitch and off road lights,93 front clip, headache rack, 37" humvee tires, ac power converter,factory buckets from quadcab, power windows and locks,cobra 29 cb w/ 102" whip, high lift jack behind seat, toolbox for the junk, visor, running lights, huge front bumper, oba,
in progress western style mirrors, holset turbo, airhorns, and some other goodies
|