|
Re: Construction Help
With the deck above, I'd imagine the water that does make it through will be well-distributed and coming through rather "gently". I would surmise your slope could be quite minimal, especially if using metal or plastic/fiberglass roofing material. I'd make sure my house-side flashing was well-placed and sealed.
You could also "build" your roof at a workable level and then hoist it into position. Maybe even build it in sections (to make it lighter for raising), making sure the section seams overlap correctly and are well-caulked.
|