The Diesel Stop banner

1 - 3 of 3 Posts

·
Registered
Joined
·
522 Posts
Discussion Starter #1
Just curious what some of your times are and if you bothered taking the X pipe out of the valley.

Just did a 2/4 inch drop on my stepside. Required me to take the bed off. Trim the bed, grind rivets and paint my frame. All together took me 14hrs. That’s a time I’m not to proud of lol. I figure it took me an hour just to set up to A-Frame and lift but still....
 

·
Registered
Joined
·
1,594 Posts
Taking it off is the easy part...
 

·
Registered
Joined
·
2,445 Posts
On my 6.0L. it's about 20 min to remove, install is longer lining up the the pipes.
 
1 - 3 of 3 Posts
Top